How it’s calculated
Mowing time follows from the mower's effective field capacity: how much area it really mows per hour once turns, overlap and stops are allowed for.
The constant 8.25 is just unit conversion: 43,560 ft² per acre ÷ 5,280 ft per mile.
Example: a 10,000 ft² lawn (0.2296 acre), 21 in (1.75 ft) mower at 3 mph and 75% efficiency. Capacity = 1.75 × 3 × 0.75 ÷ 8.25 = 0.477 acres/h, so mowing takes 0.2296 ÷ 0.477 = 0.481 h (28.9 min). With 20% extra for trimming, 0.577 h on site. Labor 0.577 × $50 = $28.86 + $5 disposal + $10 travel = $43.86 (above the $40 minimum). 7% tax = $3.07. Price per mow = $46.93, and 20 mows cost $938.60 for the season.
Field efficiency is a judgment call: it falls on small, cut-up or sloped lawns. Time a few real jobs and adjust it. This is a planning estimate only. It does not include anything not entered above, such as permits, inspections, engineering, site preparation, demolition or disposal (unless entered), access or equipment problems, regional surcharges, contingency or price changes. Get written quotes before committing.
Frequently asked questions
How long does it take to mow an acre?
It depends on the mower. A 60 in (5 ft) mower at 6 mph with 80% efficiency does 5 × 6 × 0.8 ÷ 8.25 = 2.9 acres per hour, so about 21 minutes per acre. A 21 in push mower at 3 mph does about 0.5 acres an hour, roughly 2 hours per acre.
What is field efficiency?
It is the fraction of the theoretical mowing rate you actually achieve, after overlapping passes, turning at the ends, avoiding obstacles and stopping to empty bags or refuel. 70 to 90% is common for open ground; lawns with beds, trees and slopes can be much lower.
How much should I charge to mow a lawn?
Work from your own costs: time on site × your hourly rate, plus travel and disposal, with a minimum charge so small lawns still pay. Compare the result with local rates before you quote.
Why have a minimum charge?
Driving to a job and setting up take about the same time whatever the lawn size, so very small lawns would otherwise not cover your costs. If the calculated price is lower than your minimum, the minimum is used.
Embed this calculator
Add this free calculator to your own website. Copy the code below into your page’s HTML:
Need this calculator branded, changed or built around your own prices?See custom business solutions →
Sources
- Selecting Forage Machinery: machine capacity C = S × W × Ef ÷ 8.25 (Dennis Buckmaster) — Purdue University
- Estimating the Field Capacity of Farm Machines (PM 696) — Iowa State University Extension and Outreach
- Grounds Maintenance Workers: Pay (Occupational Outlook Handbook) — U.S. Bureau of Labor Statistics
Formulas are taken from the free public references above. Results are provided “as is” for informational and educational purposes only. See our disclaimer.
Added · Last updated · How we check our calculators
Spotted a mistake or missing option? Report a problem· Suggest a calculator