How it’s calculated
The US Army Corps of Engineers (USACE) builds sandbag levees as a pyramid. Each bag is about 1 ft long, and three layers stack to about 1 ft of height, so a levee one foot high has 3 layers, 2 ft has 6 layers and so on. The bottom layer is as many bags wide as there are layers, and each layer above has one fewer bag.
| Levee height | Bags per 100 ft (USACE) | Tons of sand (USACE) |
|---|---|---|
| 1 ft | 600 | 12 |
| 2 ft | 2,100 | 42 |
| 3 ft | 4,500 | 90 |
| 4 ft | 7,800 | 150 |
Example: a 100 ft levee 2 ft high has 6 layers, so 6 × 7 ÷ 2 = 21 bags per foot and 2,100 bags. At 40 lb of sand per bag that is 84,000 lb = 42 tons of sand, the same as the USACE table. (The USACE table lists 150 tons for the 4 ft row, but 7,800 bags at 40 lb is 156 tons; the other rows match 40 lb per bag exactly.)
A single row 1 ft high is 3 layers, or 300 bags per 100 ft. Single stacks are not recommended above about 3 courses, and they work only where there is no fast current or floating debris. Fill bags one-half to two-thirds full and do not tie them, lap each bag over the one below, stagger the joints, and tamp each bag in place. Sandbags reduce flood damage but do not guarantee a dry site, so follow local emergency guidance. Filled sandbags are heavy, so lift with your legs and wear gloves.
Frequently asked questions
How many sandbags do I need for a 100 foot wall 2 feet high?
Using the USACE pyramid method it is 2,100 bags, which is about 42 tons of sand at 40 lb per bag. A single row stack only 1 ft high would be 300 bags per 100 ft.
How high can I stack sandbags?
USACE says single-row stacks should not generally go above three layers (about 1 ft). For higher barriers use the pyramid, which is wider at the base. Its table goes up to 4 ft.
How wide should a sandbag wall be at the base?
In the USACE pyramid, the bottom layer has as many bags across as there are layers. That works out to about 2½ ft of base for every foot of height (3 bags is about 2½ ft).
How much sand fills a sandbag?
Bags are about 14 × 24 in and are filled one-half to two-thirds full, which is roughly 40 lb of sand in the USACE figures. Heavier bags are harder to handle, so do not overfill.
Embed this calculator
Add this free calculator to your own website. Copy the code below into your page’s HTML:
Need this calculator branded, changed or built around your own prices?See custom business solutions →
Sources
- Sandbagging Techniques (pyramid placement, bags per 100 linear feet of levee, bag size and fill) — U.S. Army Corps of Engineers, Northwestern Division (hosted by Utah State University Extension)
- Flood Fighting Techniques booklet (bags and tons of sand per 100 linear feet of levee) — U.S. Army Corps of Engineers (hosted by City and Borough of Juneau)
Formulas are taken from the free public references above. Results are provided “as is” for informational and educational purposes only. See our disclaimer.
Added · Last updated · How we check our calculators
Spotted a mistake or missing option? Report a problem· Suggest a calculator